Stage-1 metro work almost complete: Reports
21 Apr, 2013 12:50 IST
Here's some good news to the residents of Hyderabad who dread traffic congestion. If reports are to be believed, come October and the Metro Rail link between Nagole and Mettuguda is almost done.
With the pillars ready and barricades removed, the stage-1metro work is progressing at a brisk pace. The trial run of the first metro coach will run within a year's time.
Localities can't wait to hop on to metro. Let's hope the stage-1 metro project takes off on time.
-Sakshipost
Tags